ONGC Commences Production from Fifth Oil Well in KG-DWN-98/2 Block, Utilizes FPSO Vessel for Gas Transport Aug. 25, 2024, 10:48 a.m. ONGC has started production from its fifth oil well in the KG-DWN-98/2 Cluster-2 asset on 24th August 2024.The company is utilising a floating production, storage, and offloading (FP… Unlock the Full Filing And Lot More Access premium insights and stay ahead of the market with Dzambhala Pro. Learn More